Wexham Park Hospital

Wexham Park Hospital

Decommission 3 existing remote condensers serving CCU ward at Wexham which were disconnected with existing pipework removed from site. New steel frameworks were specifically built for the arrival of new chillers. Crane lift at a reach of 66m organised to lift old condensers off roof for disposal. Prefabricated steel frameworks for new chillers were then lifted onto roof which were then made ready for the arrival of new chillers. New chillers bolted to new steel frameworks which were then connected with new pipework and commissioned for use.

Decommission 3 existing remote condensers serving CCU ward at Wexham which were disconnected with existing pipework removed from site. New steel frameworks were specifically built for the arrival of new chillers. Crane lift at a reach of 66m organised to lift old condensers off roof for disposal. Prefabricated steel frameworks for new chillers were then lifted onto roof which were then made ready for the arrival of new chillers. New chillers bolted to new steel frameworks which were then connected with new pipework and commissioned for use.

READ MORE


Key benefits
  • Modern Equipment
  • Efficient Operation
  • 24/7 Support
Key objectives
  • Future Longevity
  • Lower Costs
  • Help When Needed